PROJECT | SCOPE OF WORK |
---|---|
UP-AYALA LAND TECHNO HUB | Supply and Installation of Variable Frequency Drives |
BONIFACIO STOP OVER | Supply and Installation of Variable Frequency Drives |
BONIFACIO ART FOUNDATION, INC | Preventive Maintenance of 28 units VFD |
DEVELOPMENT ACADEMY OF THE PHILIPPINES TAGAYTAY | Supply and Delivery of LEDs |
6750 AYALA AVENUE JOINT VENTURE | Supply and Installation of Variable Frequency Drives |
POLARIS CORPORATE CENTER | Technical Expertise Services for Variable Frequency Drives |
VERTIS NORTH | Supply & Installation of Variable Frequency Drive for Hex Pump 1 |
CAPITAL ONE | Preventive Maintenance of 18 units VFD |
CAPITAL ONE | 1st, 2nd & 3rd Quarters RODAC Testing for year 2020 |
UNIMART INCORPORATED | Supply and Installation of Variable Frequency Drives |
UNIMART INCORPORATED | Supply and Installation of Molded Case Circuit Breaker |
PRIMEWATER | Supply and Delivery of VFD Fan |
PROJECT | SCOPE OF WORK |
---|---|
AYALA LAND, INC | Supply and Installation of VFD for PCWP 4 units 67KW motor rating
|
TOWER ONE | Supply and Installation of VFD for 8 units AHU 15KW
|
AYALA LAND, INC. MSE BLDG | Supply and Installation of VFD
|
ALI COMMERCIAL CENTER INC. GREENBELT 5 | Supply and Delivery of Additional VFD
|
AYALA LAND, INC. KGB Building | Supply and Installation of 2 units VARIABLE FREQUENCY DRIVES, IP54, 3Ø, 60Hz, 380 - 480V
|
ONE EVOTECH BLDG | Supply, Delivery, Installation, Testing and Commissioning of 3 units VFd for Booster Pumping Station
|
ALI COMMERCIAL CENTER INC. GREENBELT 3 | Supply and Installation of CPS
|
ALI COMMERCIAL CENTER INC. GREENBELT 5 | Rewiring of Existing VARIABLE FREQUENCY DRIVES & WYE DELTA
|
GLENSWORTH DEVELOPMENT INC. ONE EVOTECH | Supply/Installation of ABB ACS550 VARIABLE FREQUENCY DRIVES
|
GLENSWORTH DEVELOPMENT INC. TWO EVOTECH | ABB ACH VARIABLE FREQUENCY DRIVE
|
AYALA LAND, INC. 6750 | Submersible Sewage Pump
|
UP NORTH PROPERTY HOLDINGS | Supply and Installation of High Efficiency Motors 7 units 30HP Primary CHW Pump & Energy, 6 units 60hp Condenser Pump & Energy Meter, 3 units 75HP CHW Pump & Energy Meters
|
ONE DELA ROSA PROPERTY DEVELOPMENT INC | Supply and Installationof High Efficiency Motors (Solaris) 2 Units 60HP Condenser Pump, 2 Units 50HP Secondary CHW Pump, 2 Units 50HP Primary CHW Pump
|
PROJECT | SCOPE OF WORK |
---|---|
CAPITAL ONE | Preventive Maintenance of 1 unit Danfoss VFD
|
CAPITAL ONE | Supply and Installation of Steri- Aire UV Emitter
|
CAPITAL ONE | Supply and Installation of 1 units ABB VFD 7.5kW (10HP), 380-480 VAC
|
CAPITAL ONE | Preventive Maintenance of 17 units ABB VFD
|
CAPITAL ONE | Supply and Installation of 72 pcs of Steri- Aire UV Emitter
|
CAPITAL ONE | Supply and Installation of 7 units Tracker TR Series Surge protection device
|
CAPITAL ONE | Supply and Installation of 3 units ABB VFD ACH550 7.5kW (10HP), 380-440VAC, 60Hz IP 54
|
CAPITAL ONE | Supply and Delivery of 3 units ABB VFD ACH550 37kW (50hp) 380-440VAC,3P, 60Hz IP 54
|
CAPITAL ONE | Supply and Installation of 1 unit EMM Standard Motor
|
CAPITAL ONE | 2018 RodacTest per SterilAire
|
CAPITAL ONE | LED Lighting Upgrade Supply and Installation of 810 pcs of Phillips Essential TLED 14.5 watts and 60 units of Phillips Master 7 watts with ET-E 10 driver
|
CAPITAL ONE | 2018 Preventive Maitenance of 17 units of ABB VFD
|
CAPITAL ONE | Supply and Installation of 11 units Tracker TR Series Surge protection device
|
HENKEL PHILIPPINES | Supply, Delivery and Installation of 810 pcs 14.5W Philips TLED and 60 pcs 7W Philips Master |
PROJECT | SCOPE OF WORK |
---|---|
DEVELOPMENT ACADEMY OF THE PHILIPPINES - PASIG | Supply, Installation and Commissioning of
Energy Conservation System and Devices Phase 1
|
DAP BLDG- Multipurpose Court | Supply of Supervision, Labor, Materials and other consumables for the replacement of 12 sets 500W Halogen Lighting Fixtures into LED Lighting Fixtures with equivalent luminos flux(lm) and electrical requirements
|
DEVELOPMENT ACADEMY OF THE PHILIPPINES - PASIG | Supply and Installation of Philips Essential Ledtube 600mm 8W865, Daylight
|
DAP BLDG-PCC Office | Supply, Installation and Commissioning of Troffer LED Lights
|
DAP BLDG-PCC Office | Supply and Installation fo Panel LED
|
DEVELOPMENT ACADEMY OF THE PHILIPPINES - PASIG | Supply, Installation and Commissioning of
Energy Conservation System and Devices Phase 2
|
PROJECT | SCOPE OF WORK |
---|---|
PANIQUI TARLAC | Supply and Installation of 2 units ABB VARIABLE FREQUENCY DRIVES
40HP 230V 3P and 1 unit VFD 20 HP 230 V |
PANIQUI TARLAC | Supply and Installation of 1 unit ABB VARIABLE FREQUENCY DRIVE
30HP 208-240V 3P IP54
|
PANIQUI TARLAC | Supply and Delivery of ABB VARIABLE FREQUENCY DRIVE
18.5 kW with NEMA 12 Enclosure, Fan and Filter
|
PANIQUI TARLAC | Supply and Delivery of HUBA Pressure Transmitter
|
PANIQUI TARLAC | Supply and Delivery of 25 meters BELDEN Shielded Wire # 16
|
PANIQUI TARLAC | Supply and Delivery of 2 Units of ABB ACS550 VARIABLE FREQUENCY DRIVES with HUBA Pressure Transmitters and 25 meters Shielded Wire # 16
|
PROJECT | SCOPE OF WORK |
---|---|
DKS NET QUAD CENTER | Supply and Installation of 70 sets Powercraft ECS Battery Packs |
PROJECT | SCOPE OF WORK |
---|---|
CITIHOMES MOLINO PHASE 4 | Supply and Installation of HELITA PULSAR 30/45/60 ESE Lighting Arrester |
AMARIS HOMES | Supply and Installation of HELITA PULSAR 30/45/60 ESE Lighting Arrester |
STERLING MANORS | Supply and Installation of HELITA PULSAR 30/45/60 ESE Lighting Arrester |
IL GIARDINO | Supply and Installation of HELITA PULSAR 30/45/60 ESE Lighting Arrester |
PROJECT | SCOPE OF WORK |
---|---|
SUNRISE (PARADIGM) THE 30TH CORPORATE CENTER | Supply and Installation of 81 units of VARIABLE FREQUENCY DRIVES |
SUNRISE (PARADIGM) THE 30TH CORPORATE CENTER | Supply and Installation of additional VARIABLE FREQUENCY DRIVES 2 units 15kW IP 54 with Built-in RFI Filter H2 and 1 unit 7.5kW IP 54 with Built-in RFI Filter H2 |
AYALA MALLS MANILA BAY | Supply & Installation of 26 units of VARIABLE FREQUENCY DRIVES for BAY AREA MIXED-USE PROJECT
|